Annual Report 2025 – ÖBB-Infrastruktur AG

ÖBB-Infrastruktur Aktiengesellschaft Group Management Report | Consolidated Financial Statements 64 Conversion of existing fossil gas heating systems Existing fossil gas heating systems will be converted to alternative energy sources by 2034 depending on their year of construction. approx. 14,300 t CO 2 e CCM/CCA 7.3. in implementation phase Conversion of gas- powered points heaters Existing gas-fuelled points will be successively converted by 2030 and natural gas replaced by electrical energy supply. approx. 800 t CO 2 e not covered in implementation phase Increase in the proportion of electric vehicles in the ÖBB road fleet As part of the annual vehicle renewal process, defined decarbonisation targets are set and implemented for each company and business division, leading to a gradual increase in the proportion of alternative drive systems in road vehicles in line with the decarbonisation strategy. approx. 4,800 t CO 2 e CCM/CCA 6.5. in implementation phase Decarbonisation of the rail maintenance fleet Diesel-powered maintenance vehicles will be replaced by vehicles with hybrid drive technology (overhead line, battery and diesel generator as fallback level). The renewal of the maintenance fleet will lead to a reduction in the size of the vehicle fleet, efficiency gains and a reduction in greenhouse gas emissions by switching from diesel to hybrid drive. approx. 1,200 t CO 2 e not covered planned Decarbonisation of the shunting locomotives Electric hybrid shunting locomotives (overhead line, battery) replace existing diesel and electric shunting locomotives. Replacing the shunting locomotives and switching to alternative drive systems will lead to efficiency gains and a reduction in greenhouse gas emissions. approx. 2,200 t CO 2 e not covered planned Decarbonisation of rescue train fleet through service jets Procurement of rescue trains of the 3rd generation to replace the rescue trains of the 1st and 2nd generation (Koralmbahn, Semmering Base Tunnel and the existing network). Replacing the fleet of rescue trains with service jets and switching to alternative drive systems will lead to efficiency gains and a reduction in greenhouse gas emissions. n.a. (included in rail maintenance fleet) not covered in implementation phase Decarbonisation of container forklifts In 2027, two diesel-powered full-container forklifts will be replaced by new electric gantry cranes. Further plans are currently being drawn up. approx. 300 t CO 2 e not covered planned

RkJQdWJsaXNoZXIy NTk5ODUz